For agencies
A link building QA process for agencies

Agencies rarely lose clients over one bad link. They lose them when a client finds a casino post beside their brand and the agency cannot say how the site was chosen.
This is a process you can adopt as written. It uses the vetting scorecard for the judgment calls and adds the parts an agency needs: roles, sign-off and records.
What a process fixes
- Inconsistency. Two staff judge the same site differently. A written line removes the argument.
- Memory. Six months on, nobody recalls why a site was approved. The sheet does.
- Pressure. Month-end targets push weak sites through. A separate approver is harder to rush.
- Client questions. "Why this site?" has an answer with a date on it.


The six stages
| Stage | Who | What happens | Output |
|---|---|---|---|
| 1. Intake | Link builder | Site is proposed with its source and the client it is for. | A new row. |
| 2. Knockouts | Link builder | Five pass or fail checks: loads, gray topics, traffic floor, no collapse, recent posts indexed. | Pass, or rejected with the reason. |
| 3. Scoring | Link builder | Ten checks scored 0 to 2. | A score out of 20. |
| 4. Sign-off | QA lead | Reviews the row, spot-checks two items, approves or rejects. | Approved, with name and date. |
| 5. Post-placement | Link builder | Day 1, day 7 and day 30 checks. | Three dated results. |
| 6. Re-checks | QA lead or tool | Day 90, 180, 365, then yearly. | Live, indexed, link present, rel unchanged. |
Stages 2 and 3 are the scorecard in the vetting checklist. Stage 5 is the post-placement checklist. Stage 6 is the re-check schedule.
Thresholds, written once
| Check | Agency line | Source |
|---|---|---|
| Search traffic | 500+ estimated visits a month, 100+ ranking keywords | Our threshold |
| Traffic retention | 30% or more of the best 3 months in 24 | Our threshold |
| Gray topics | None, anywhere in the sitemap | Our threshold |
| Outbound links | No more than 15 per post on average | Our threshold |
| Sponsored share | No more than 30% of the 20 newest posts | Our threshold |
| Score to buy | 16 of 20, or 11 to 15 with a reduced price | Rule of thumb |
| Client relevance | Site subject matches the client's | Your call per client |
These are the lines we use, published on our methodology page. Adopt them or set your own. What matters is that the line is written before the site is looked at, and that changing it means editing this table.
Two roles, kept apart


- Link builder. Finds sites, runs the checks, records the evidence, places the order after approval.
- QA lead. Did not find the site. Reviews the row, re-runs two checks at random, signs off, and owns the re-check schedule.
In a small agency the QA lead can be the account manager or the owner. The point is a second pair of eyes with no stake in the monthly count.
The record
| Group | Columns |
|---|---|
| Identity | Site, client, proposed by, date, source of the site. |
| Knockouts | Five results, each with the evidence: the sitemap address searched, the traffic figures, the three post addresses tested. |
| Score | Ten scores and the total. |
| Terms | Price, link type, label, permanence, replacement, with the date of the seller's email. |
| Decision | Approved or rejected, by whom, when, and why. |
| Placement | Address, date live, target page, anchor, rel on day one. |
| Checks | Day 1, 7, 30, 90, 180, 365: four results each. |
One row per site per client. A rejected site keeps its row, so nobody proposes it again next quarter.
How many sites to expect to reject
Our intake is a broad sweep, so your reject rate on sites sourced from seller lists will be lower. Still expect most proposed sites to fail, and budget link builders' time for that. Vetting at scale covers the order that keeps the cost down.
A monthly audit


- Pull ten approved rows at random. Is every evidence field filled in?
- Re-run the gray-topic search on three of them.
- Count rejections by stage. If nothing is ever rejected at sign-off, sign-off is not happening.
- Check last month's re-checks were done on their dates.
- Report the survival rate to clients. See reporting link quality.
How to check this yourself
- Copy the six stages into your own process document.
- Write your thresholds in one table and date it.
- Name a QA lead who is not responsible for link targets.
- Build the sheet with the column groups above.
- Run the next ten sites through it and time each stage.
- Hold the first monthly audit and fix whatever it shows.
Questions buyers ask
- How long should QA take per site?
- Time it in your own team. The free knockouts take minutes. The traffic checks need a data tool. Sign-off should be a short review of a completed row, not a repeat of the work.
- Do small agencies need a separate QA lead?
- They need a second person to approve, even if it is the owner. The separation matters more than the job title.
- Should clients see the QA sheet?
- Showing the checks and thresholds builds trust. Agencies often keep seller contacts and prices internal. Decide once and apply it to every client.
Related guides
Sources
Last updated Methodology